Sheet Metal- Indian Railways
ICF Chennai, MCF- Raebareli, RCF Kapurthala
Manufactured Parts
- Entrance Door, RCF/MCF
- WTCC LHB non AC Coaches, RCF/MCF
- WTCC Antyodaya Coaches, RCF
- Underframe LHB GS EOG Coaches, MCF
- Roof Complete LWS Coaches
- End Part Comp MEMU TC Coaches
- Side Wall LHB SCN Coaches
- Bogie Frame Arrangement AC-AC DMU Coaches
- Bogie Frame Arrangement EMU Trailer Coaches
- Bogie Frame Arrangement LHB Coaches
- Underframe Complete MEMU/TC Coaches
FRP- Metro Rolling Stock
Chennai Metro
(Awarded in 2011)
- MSL successfully executed the CMRL
- 1st Phase of Project - Front Mask for 33, Train Set (66 Front Mask and Interior Panels).
- Manufacturing Process : Hand lay-up, painted parts with Gloss above 90%.
- 2nd Phase of Project - 10 Train sets executed in 2019.
FST Standard
NFF 16101(French Standard)
NFF 16101(French Standard)
Products Supplied
- Front mask scope
- Exterior garnishing components
- Driver desk
- Cab fitting garnishing components
Sydney Metro
(Awarded in 2016)
- MSL successfully executed the Sydney Metro.
- 1st Phase Project Front Mask for 22, Train Set (44 Front Mask and D/C Interior Panels).
- Manufacturing Process : Hand lay-up, painted parts with Gloss above 90%.
- 2nd Phase 23 Train set (Under Execution).
FST Standard
EN 45545-2 HL-2
EN 45545-2 HL-2
Products Supplied
- Front mask scope
- Exterior garnishing components
- Driver desk
- Cab fitting garnishing components
Mumbai Metro
(Awarded in 2011)
- Mumbai Metro under execution.
- 1st Phase ML3 Project Front Mask for 31, Train Set (62 Front Mask and D/C Interior Panels).
- Manufacturing Process: Hand lay-up, painted parts with Gloss above 90%.
Lucknow Metro
(Awarded in 2016)
- MSL successfully executed the Lucknow Metro
- 1st Phase Project Interior Paneling Like:-Side wall, End Partition, Gangway Partition.
- 20 Train Set (80 Coach Interior Panels).
- Manufacturing Process : LRTM Pigmented Gel Coated with 70% Gloss.
FST Standard
NFF 16101(French Standard)
NFF 16101(French Standard)
Products Supplied
- Coach interior Side wall
- Gang ways
- Cab partition
Talent II
- Executed through Stratiforme France JV partner Front Mask, Spoiler, Exterior Paneling.
- Manufacturing Process: Hand lay-up
Regio 2N
(Awarded in 2016)
- Executed through Stratiforme France JV Partner Front Mask, Exterior and Interior Paneling.
- Manufacturing Process: Hand lay-up
FRP – Locomotive Rolling Stock
GE Transportation - Alstom E Loco
Supplying FRP Parts for their locomotive business in USA for Erie (PA) and Fort worth (Texas) Plants since 2008.
Parts manufactured by RTM, Filament winding, compression moulding, and Hand Lay-up Process Gel coat and Painted finish with Sea worth packing.
List of products supplied
- Toilet Encloser with Door
- Vestibule Doors
- Battery Covers
- Insulation Tie Rings
- Sink
- Tie Baffle
- Shroud
FRP – Indian Railways
ICF Chennai, MCF- Raebareli, RCF Kapurthala
Approved Parts
- Interior Paneling for Driver Cabs
- Interior Paneling for LHB Passenger Coaches
- Interior Paneling for MEMU/MRVC/ IGBT/DMU/DPC Coaches
- Locomotive Parts
- Trough Below AC cover
Under Approved Parts
- Nose Cone T18 (Vande Bharat)
- Modular Toilet
- Interior Paneling for T18 (Vande Bharat)
- Furnishing of full coach interiors
LHB Coach Interiors, Indian Railways
Types of Coaches
First Class AC/ AC 2 Tier/ AC 3 Tier/ 3 Tier Sleeper/ Chair Car
Products Supplied
- Side wall Ceiling sheet/End wall
- Toilet Modules
Manufacturing Process
Hand Lay-up
Finish Requirement
Gel coated finish with Gloss more than 60
Mechanical properties + FST Standard
MDTS – 133 & MDTS- 214
Best experience awaits
With more two decades of industry experience and highly skilled workforce we offer solutions that narrate a story of success and reliability.
Get in touch now for more information or quotes
Get in touch now for more information or quotes